SAP PP What is MRP Area And How Is It defined
What is MRP Area And How Is It defined
What is MRP Area And How Is It defined
|
What is MRP Area. How it is defined? What are the points to be considered while defining a MRP Area? The MRP area is an organizational unit for which material requirements planning can be carried out independently outside of total plant level MRP run which is done using MD01 for entire plant. by creating a specific scope of planning and is maintained in the MRP view of the material master
But first you need to create it in SPRO and if needed assign the storage locations or materials masters to the mrp area and MRP with MRP areas for the material is not activated until the material has been assigned to an MRP area. If you have not assigned a material to an MRP area, that is, you have not created an MRP area segment in the material master, the material will continue to be planned in the plant MRP area only.
Basically, there are three types of MRP area:
1. Plant MRP Area The plant MRP area initially contains the plant together with all its storage locations and stock with subcontractors. When you have defined the other 2 types of MRP areas for storage locations and for subcontractors and you have assigned the materials, the plant MRP area is reduced by exactly this number of subcontractors and storage locations. This is because they are now to be planned separately.
2. MRP Areas for Storage Locations You can define an MRP area that consists of a particular storage location, by creating an MRP area and assigning the storage location to it. Material requirements for this storage location are then planned separately from the rest of the plant. You can also group several storage locations into one MRP area, by creating an MRP area and assigning the storage locations to it. These storage locations are then planned together.
3. MRP Areas for Subcontractors You can also define an MRP area for each subcontractor. A subcontractor may be assigned to only one MRP area.
Advantages of using MRP area and highlights. 1. You can carry out MRP specifically for the determined MRP areas. This enables you to carry out differentiated material requirements planning. 2. Finished products and important assemblies intended for make-to-order or engineer-to-order production are always planned in the plant MRP area 3. The planning run takes into account the planning with MRP areas as follows: 4. If you do not enter a separate scope of planning, the system plans the whole plant, that is, all MRP areas in the plant, during the total planning run. If you want to carry out a total planning run for a particular MRP area only, you must specify the required MRP area in the scope of planning. 5. During single-item, multi-level planning, the system plans the selected material in the MRP area entered. In addition, the system takes into account planning file entries from other MRP areas, for example, if the material is to be procured using stock transfer. 6. During single-item, single-level planning, the system plans the selected material in the MRP area entered only.
Now, for running the cycle for MRP areas, we need to define in SPRO.
IMG -> Production Planning -> MRP -> Master data -> Define MRP Areas Specify Area types 01 - Plant MRP Area, 02 - Storage Location MRP Area 03 - Sub contractor MRP Area. After defining MRP area, assign the material to the specific MRP area in the MRP1 view of the Material master and define the MRP1 & 2 views specific for those areas. Enter the requirements for the specific MRP areas, if you do not enter the MRP area, MRP area by default will be picked as Plant MRP area. Also, need to run MRP, by entering appropriate MRP area. Stock/Rqmts list to be selected by entering the MRP area in the selection screen. |
來自 “ ITPUB部落格 ” ,連結:http://blog.itpub.net/29829936/viewspace-2134497/,如需轉載,請註明出處,否則將追究法律責任。
相關文章
- SAP PP how to re-read master data for process order?AST
- MRP area的三種型別型別
- what is conversion exit defined in ABAP domainAI
- 設計模式 what? why? how?設計模式
- PP實施經驗分享(5)——SAP中MD04顯示常用函式(讀取SAP MRP執行資料)函式
- SAP PP相關函式函式
- Web效能優化:What? Why? How?Web優化
- SAP ERP PP模組常用報表
- SAP MRP的計算步驟
- 白板程式設計淺談——Why, What, How程式設計
- SAP PP (Production Planning) Training TutorialAI
- What is a deadlock and how does one fix deadlock errors?Error
- SAP PP使用ECR去修改BOM主資料
- SAP PP的動態安全庫存(轉載)
- What is OPAQUE_TRANSFORM Hint and how to Control it [ID 780503.1]OpaqueORM
- SAP S4 HANA - What is it all about?
- How to modify multiple items in the SAP menu
- sap知識-MPS和MRP的區別
- Linux的3W(What/Why/How)註解(轉)Linux
- What to Expect When Moving From SAP Business Suite to SAP S/4 HANAUI
- SAP-PP-CO 生產訂單狀態詳解
- SAP PP 啟用了HU管理下的工單入庫
- sap 獲取計劃訂單bapi_PP 常用bapiAPI
- How to Configure a New Plant in SAP?
- set an MRP type for MRP in the material master (MRP 1 view).ASTView
- How to move Oracle Spatial objects from SYSAUX tablespace to a user defined tablespace [ID 1119758.1OracleObjectUX
- SAP MM MRP Type PD + Lot Size HB 組合無效?
- How to prove that SAP CRM WebUI is a stateful applicationWebUIAPP
- How does SAP freelancer find a project that is not tough?Project
- SAP PP使用ECR去修改Recipe主資料,報錯:Generation not supported
- SAP PP C201使用ECR建立Recipe主資料
- SAP全球研發服務中心 招聘 Solution Development Consultant – PP Module:dev
- SAP MRP 平衡在MM模組採購流程中的體現
- SAP PP MD04結果裡沒考慮受限使用庫存?
- SAP PP為工單建立好HU之後,如何查詢HU號碼?
- SAP PP ECR的Profile規定了用它可以修改哪些資料物件物件
- GoldenGate - What is supported and what is not ....Go
- MRP資訊彙總BAPI(Z_IF_MRP_TOTAL_LIST)API