What is SAP KANBAN?

For those of us who are not aware what the term,  "Kanban" refers to, this is a process which is related to monitoring and regulating the flow of material and production which is primarily based on the quantity of the material stock in production. This is the quantifiable stock which is prerequisite on a regular basis and is readily kept available in smaller quantities in production.


As per the principle of Kanban, the production of a material takes place only when a certain quantity of the material has been consumed. This  refill is initiated directly by production by virtue of using the previously maintained master data. All the existing entries data in the system are thereby reduced to a minimum level - for example, to the input of a  bar code. All other activities in the system are directly carried out in the background, automatically. By using  Kanban, the process of production has been designed in such a manner that it controls itself and all the manual posting effort is thereby to the maximum extent possible. It has been observed that upon using this principle that there is reduction of lead time along with stock levels.




As per Kanban the delivery of the material comprises of the requirement of work which varies as per the demand of the demand and consumer source and by sending a card to the work center which leads to the production of material which can be supply source and producer. This card signifies how much material is used and where all it has to be delivered. These cards are referred to as  "Kanbans" in the  Japanese terminology. Upon receiving the material, the receipt of goods at the source of demand has to be posted automatically and all of this is done via the bar code which is visible on Kanban.




Implementation Considerations


There are a few requirements which have to be duly considered before using the principle of Kanban in an optimum manner.


  • Before implementing  Kanban the consumption of the goods has to be relatively constant within a specified period which is longer than the replacement lead time of a Kanban. Assuming that the good is required in a specific periodically in large quantities, but not a regular basis. In such cases The number of Kanbans required is large to ensure that the supply of material remains stable, however we also need to keep in mind that this could result in a high level of stock even when there material is not required.

  • The supply source has to be proficient of producing a large number of small lots in a short time. To break through this cycle the amount of time required for setting up the  production has to be reduced to a level which is fairly low along with an increase in the reliability of production has to be increased. The need for waiting till a suitable time when many kanbans have to be sent for good which lead to the time when productions can be started, would eventually lead to the failure of using the principle of production control in Kanban.

 