Oracle OCP 1Z0 053 Q701(RESUMABLE_TIMEOUT)

abstractcyj發表於2016-03-31
701. A user receives the following error while performing a large volume of inserts into a table:

The issue is resolved by increasing the space quota on the USERS tablespace for the user. But the user
may perform such transaction in the future. You want to ensure that the command waits rather than
produce an error when such an event occurs the next time.
What can you do to achieve this before running the command in the future?
A.Set RESUMABLE_TIMEOUT for the instance.
B.Set the RESOURCE_LIMIT Parameter to TRUE.
C.Enable the database instance to use asynchronous commit.
D.Set the LOG_CHECKPOINT_TIMEOUT parameter to a nonzero value for the database instance.
Answer:A


來自 “ ITPUB部落格 ” ,連結:http://blog.itpub.net/8520577/viewspace-2073192/,如需轉載,請註明出處,否則將追究法律責任。

相關文章